Product characteristics

23 ℃ drying time (hour)
density (g/cm³)
volume solids content (%)
color
23 ℃ coating interval (hour)
mass solid content (%)
colors
nonvolatile content (%)
magnetic content (%)
density at 25℃ (g/cm³)
theoretical coating rate (m²/ kg) (with 60um dry film)
particle size distribution >150um (%)
particle size distribution >250um (%)
component a (kg/ barrel)
21
18
33
component b (kg/ barrel)
3
2
application period (23 ℃)(23 ℃)
4
appearance
surface resistance (Ω)
curing time at 230℃ (min)
gelpectization time at 200℃ (s)
SLE05 steel powder paint (grey)

1 sku

SLE05 steel powder paint (grey)

Technical parameters

1. Color: Grey;
2. Density (23℃): About 1.3-1.5g/cm³;
3. Nonvolatile content ≥ 99.5%;
4. Particle size distribution: Oversize 150μm≤3%; oversize 250μm≤0.2%;

Executive standard

JG3042-1997

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now
SLE08 anti-epoxy powder in cast iron pipe (grey)

1 sku

SLE08 anti-epoxy powder in cast iron pipe (grey)

Technical parameters

1. Color: Grey;
2. Density (23℃): About 1.43g/cm³;
3. Nonvolatile content ≥ 99.5%;
4. Magnetic content <0.002%;
5. Gelpectization time (200℃): 55s;
6. Curing time (200℃) ≤30min;
7. Particle size distribution >150um, 1.2%; > 250um, 0.07%;

Executive standard

SY/T0442-2010

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now
SLE08 anti-epoxy powder in cast iron pipe (yellow)

1 sku

SLE08 anti-epoxy powder in cast iron pipe (yellow)

Technical parameters

1、color:yellow;
2. Density (23℃): About 1.43g/cm³;
3. Nonvolatile content ≥ 99.5%;
4. Magnetic content <0.002%;
5. Gelpectization time (200℃): 55s;
6. Curing time (200℃) ≤30min;
7. Particle size distribution >150um, 1.2%; > 250um, 0.07%;

Executive standard

SY/T0442-2010

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now
SLE09 epoxy alloy composite (eccentric wear) powder paint (white)

1 sku

SLE09 epoxy alloy composite (eccentric wear) powder paint (white)

Technical parameters

1. Color: White;
2. Density (25℃): 1.3-1.65g/cm³;
3. Nonvolatile content ≥ 99.4%;
4. Magnetic content <0.002%;
5. Gelpectization time (180℃) ≤180s; (200℃):≤120s, (230℃):≤60s;

Executive standard

SY/T0442-2010

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now
SLE15 fusion bonded epoxy powder paint (multi-color)

1 sku

SLE15 fusion bonded epoxy powder paint (multi-color)

Technical parameters

1. Color: Matching of multiple colors;
2. Density (25℃): 1.3-1.6g/cm³;
3. Nonvolatile content ≤ 0.6%;
4. Magnetic content <0.002%;
5. Gelpectization time (205±3℃) ≥ 12S;
6. Curing time (220℃) ≤ 3min;
7. Particle size distribution/%: Oversize 150μm≤4; oversize 250μm≤0.2;

Executive standard

SY/T0315-2013

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now
SLE04 anti-epoxy powder paint in tubing (white)

1 sku

SLE04 anti-epoxy powder paint in tubing (white)

Technical parameters

1、color:white;
2. Density (23℃): About 1.38g/cm³;
3. Nonvolatile content ≥ 99.5%;
4. Magnetic content <0.002%;
5. Gelpectization time (200℃) SLE04-1:25s; SLE04-2:90s;
6. Curing time (200℃) SLE04-1:5min, SLE04-2:30min;
7. Particle size distribution >150um, 1.2%; > 250um, 0.07%;

Executive standard

SY/T0442-2010

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now
SLE01 single-layer fusion bonded epoxy powder paint (green)

1 sku

SLE01 single-layer fusion bonded epoxy powder paint (green)

Technical parameters

1. Color: Green;
2. Density (25℃): About 1.42g/cm³;
3. Nonvolatile content ≥ 99.5%;
4. Magnetic content <0.002%;
5. Gelpectization time (230℃) 8~30s usually about 12s;
6. Curing time (230℃) ≤ 1.5min;
7. Particle size distribution >150um, 0.62%; > 250um, 0.03%;

Executive standard

SY/T0315-2013

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now
SLE02 three-layer PE fusion bonded epoxy powder paint (white)

1 sku

SLE02 three-layer PE fusion bonded epoxy powder paint (white)

Technical parameters

1. Color: White;2. Density (25℃): About 1.45g/cm³;
3. Nonvolatile content ≥ 99.5%;
4. Magnetic content <0.002%;
5. Gelpectization time (200℃) is 12s;
6. Curing time (200℃) ≤3min;
7. Particle size distribution >150um, 0.87%; > 250um, 0.08%;

Executive standard

GB/T23257-2009

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now
SLE03 dual-layer PE fusion bonded epoxy powder paint (white)

1 sku

SLE03 dual-layer PE fusion bonded epoxy powder paint (white)

Technical parameters

1. Color: White;
2. Density (25℃): About 1.52g/cm³;
3. Nonvolatile content ≥ 99.5%;
4. Magnetic content <0.002%;
5. Gelpectization time (205℃) ≥ 12s;
6. Curing time (230℃) ≤3min;
7. Particle size distribution >150um, 0.38%; > 250um, 0.08%;

Executive standard

Q/CNPC 38-2002 Q/SY 1038-2007

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now
SLE04 anti-epoxy powder paint in tubing (multi-color)

1 sku

SLE04 anti-epoxy powder paint in tubing (multi-color)

Technical parameters

1. Color: Matching of multiple colors;
2. Density (23℃): About 1.38g/cm³;
3. Nonvolatile content ≥ 99.5%;
4. Magnetic content <0.002%;
5. Gelpectization time (200℃) SLE04-1:25s; SLE04-2:90s;
6. Curing time (200℃) SLE04-1:5min, SLE04-2:30min;
7. Particle size distribution >150um, 1.2%; > 250um, 0.07%;

Executive standard

SY/T0442-2010

Supply capability

Brand : SHENGFANG

Guarantee period : 12 months since cargo delivery date from storage

Enquiry Now