Product characteristics

boundary dimensions (l*w*h) (mm)
materials
applicable roadway gradient
crawler plate width (mm)
crawler speed (m/min)
cutting head speed (rpm)
cutting power (kw)
loading type
machine weight (t)
maximum heading height (mm)
pressure to the ground (mpa)
pump station power (kw)
rock cutting strength (mpa)
total installed power (kw)
voltage (v)
maximum disassembling weight (kg)
roof bolter switching device
expansion length (mm)
maximum disassembling size (l*w*h, mm)
maximum heading width (mm)
EBZ160 Semi-coal-rock Heading Machine

1 sku

EBZ160 Semi-coal-rock Heading Machine

Technical parameters

1. Machine weight (t): 45;
2. Boundary dimensions (L*W*H) (mm): 9300×2300×1670;
3. Total installed power (kW): 286;
4. Pump station power (kW): 100;
5. Cutting power (kW): 160/100;
6. Cutting head speed (rpm): 47/23;
7. Expansion length (mm): 550;
8. Maximum heading height (mm): 4800;
9. Maximum heading width (mm): 5000;
10. Rock cutting strength (MPa): ≤80;
11. Crawler speed (m/min): 0-7;
12. Crawler plate width (mm): 550;
13. Pressure to the ground (MPa): 0.135;
14. Loading type: Separated Spider;
15. Voltage (V): 660/1140;
16. Applicable roadway gradient: ±18°;
17. Roof bolter switching device: standard;
18. Support cylinder: none;
19. Forepoling: optional;
20. Maximum disassembling size (L*W*H): 3370*1190*1400;
21. Maximum disassembling weight (kg): 4860.

Executive standard

Company standard

Supply capability

Brand : SHIMEI

Guarantee period : 18 months after leaving the factory or within 12 months since putting into use, whichever occurs first

Enquiry Now
EBZ200 (A) Rock Heading Machine

1 sku

EBZ200 (A) Rock Heading Machine

Technical parameters

1. Machine weight (t): 68;
2. Boundary dimensions (L*W*H) (mm): 11000×2700×1880;
3. Total installed power (kW): 362;
4. Pump station power (kW): 110;
5. Cutting power (kW): 200/150;
6. Cutting head speed (rpm): 46/23;
6. Spade width (mm): 3200;
7. Maximum heading height (mm): 4855;
8. Maximum heading width (mm): 6000;
9. Rock cutting strength (MPa): ≤100;
10. Crawler speed (m/min): 0-7;
11. Crawler plate width (mm): 650;
12. Pressure to the ground (MPa): 0.152;
13. Loading type: Separated Spider;
14. Voltage (V): 1140;
15. Applicable roadway gradient: ±18°;
16. Roof bolter switching device: optional;
17. Maximum disassembling size (L*W*H) (mm): 3330×1416×1610;
18. Maximum disassembling weight (kg): 8200.

Executive standard

Company standard

Supply capability

Brand : SHIMEI

Guarantee period : 18 months after leaving the factory or within 12 months since putting into use, whichever occurs first

Enquiry Now
EBZ200 Heading Machine

1 sku

EBZ200 Heading Machine

Technical parameters

1. Machine weight (t): 58;
2. Boundary dimensions (L*W*H) (mm): 10620×2690×1830;
3. Total installed power (kW): 321;
4. Pump station power (kW): 110;
5. Cutting power (kW): 200/110;
6. Cutting head speed (rpm): 46/23;
7. Expansion length (mm): 650;
8. Spade width (mm): 3600;
9. Maximum heading height (mm): 5270;
10. Maximum heading width (mm): 6630;
11. Rock cutting strength (MPa): ≤80;
12. Crawler speed (m/min): 0-7.5;
13. Crawler plate width (mm): 650;
14. Pressure to the ground (MPa): 0.135;
15. Loading type: Separated Spider;
16. Voltage (V): 1140;
17. Applicable roadway gradient: ±18°;
18. Roof bolter switching device: optional;
19. Forepoling: optional;
20. Maximum disassembling size (L*W*H) (mm): 3130×1400×1600;
21. Maximum disassembling weight (kg): 6000.

Executive standard

Company standard

Supply capability

Brand : SHIMEI

Guarantee period : 18 months after leaving the factory or within 12 months since putting into use, whichever occurs first

Enquiry Now
ZDY520JS (With 135 Heading Machine)

1 sku

ZDY520JS (With 135 Heading Machine)

Technical parameters

1. Heading depth: 20-40m;
2. Heading speed: 0-2m/min (coal seam);
3. Heading specification: rock >60mm coal seam>110mm;
4. Drill pipe specification: medium 42/ 69 (twist drill);
5. Maximum heading thrust: 12KN;
6. One stroke of heading machine: 1.2m;
7. Heading speed: high speed 300 r/min, low speed 300 r/min;
8. Heading torque: high speed 420N.m, low speed 420N.m;
9. Hydraulic motor of heading machine: 12MPa, 107l/min, 19kw.

Executive standard

Company standard

Supply capability

Brand : SHIMEI

Guarantee period : 18 months after leaving the factory or within 12 months since putting into use, whichever occurs first

Enquiry Now
LINC 2 Electronic Control Unit

1 sku

LINC 2 Electronic Control Unit

Technical parameters

1. 24-circuit digital input (12 circuits for pulling up, 12 circuit for pulling down);
2. 20-circuit analog input (0-5V);
3. 9-circuit frequency input;
4. 8-circuit low-side digital output;
5. 32-circuit PWM output (with current feedback);
6. 2-circuit power supply.

Executive standard

Company standard

Supply capability

Brand : linde

Guarantee period : 12 months from the date of delivery

Enquiry Now
S150-22 pick

1 sku

S150-22 pick

Technical parameters

Material: 42CrMo + carbon tungsten alloy

Executive standard

Corporate Standard

Supply capability

Brand : TIANYI

Guarantee period : Vulnerable parts does not have warranty period.

Enquiry Now
U47 toothholder sleeve

1 sku

U47 toothholder sleeve

Technical parameters

Material: 42CrMo

Executive standard

Corporate Standard

Supply capability

Brand : TIANYI

Guarantee period : Vulnerable parts does not have warranty period.

Enquiry Now
U84 toothholder sleeve

1 sku

U84 toothholder sleeve

Technical parameters

Material: 42CrMo

Executive standard

Corporate Standard

Supply capability

Brand : TIANYI

Guarantee period : Vulnerable parts does not have warranty period.

Enquiry Now
U95-30coal mining machine pick

1 sku

U95-30coal mining machine pick

Technical parameters

Material: 42CrMo + carbon tungsten alloy

Executive standard

Corporate Standard

Supply capability

Brand : TIANYI

Guarantee period : Vulnerable parts does not have warranty period.

Enquiry Now
SD9 Bulldozer

2 sku

SD9 Bulldozer

Technical parameters

Bucket capacity: 13.5m3

Executive standard

Enterprise Standard

Supply capability

Brand : HBXG

Guarantee period : 12 months or 1,500 hours from the date of delivery, whichever comes first

Enquiry Now